Dear Jacob - Congratulations! What did you decide to add as your interactive features? How much time do you have to get it done, and when will it be on display, etc? Take care - Grace
The installation dates are Jan 31, Feb 1,7,8 (meaning that the majority of construction has already happened off site by then).
The exhibit runs March 7 through Dec 31
The removal dates are Jan 2,3,9,10 (2010) in which I get to keep or sell the playhouse.
As a side note: The advantage to being at a large firm is that there are plenty of people willing to help out with this. My friend Jason and I are scheduling the materials and construction needs and hopefully will get some stuff donated. Also, the arboretum gives us $2500 which should cover most of it.
You are the man!
ReplyDeleteAnd I'm even more glad about Heath being back. Give him our love.
Glad to hear about both pieces of good news! Looks like a fun challenge is ahead of you! Take it easy.
ReplyDeleteDear Jacob -
ReplyDeleteCongratulations!
What did you decide to add as your interactive features?
How much time do you have to get it done, and when will it be on display, etc?
Take care -
Grace
Congrats! What is the timeline for building this thing?
ReplyDeleteThanks everyone.
ReplyDeleteThe installation dates are Jan 31, Feb 1,7,8 (meaning that the majority of construction has already happened off site by then).
The exhibit runs March 7 through Dec 31
The removal dates are Jan 2,3,9,10 (2010) in which I get to keep or sell the playhouse.
As a side note: The advantage to being at a large firm is that there are plenty of people willing to help out with this. My friend Jason and I are scheduling the materials and construction needs and hopefully will get some stuff donated. Also, the arboretum gives us $2500 which should cover most of it.
Oh and I decided to do a mural on the sides of the planters for the interactive element.
ReplyDeleteso how big is it? like actual size or scaled down?
ReplyDelete